01FIELD NOTE
Before installation day
A clear site makes room for a coordinated installation.
- Confirm loading dock, freight elevator, and parking access.
- Share floor plans and the latest furniture specifications.
- Identify staging areas and routes that need protection.
- Check that other trades have completed the work your installation depends on.
- Assign a point of contact for access, questions, and the final walkthrough.
Talk through your project
02FIELD NOTE
Planning a laboratory furniture installation
Start with the furniture—and the work that happens around it.
- Map equipment sizes, clearances, and the intended workflow.
- Confirm surface, storage, and furniture specifications with your laboratory team.
- Coordinate the locations of utilities with qualified trades.
- Define the boundary between furniture installation and specialist commissioning.
- Document handling requirements and the review process before delivery.
Talk through your project
03FIELD NOTE
Making the next move work
A good relocation plan knows what is moving and where it is going.
- Inventory furniture and identify pieces for reuse.
- Check the new layout against the components you already own.
- Label furniture by destination and coordinate the delivery sequence.
- Agree on phased access and operating constraints.
- Plan for surplus furniture, packaging, and the final adjustments.
Talk through your project
04FIELD NOTE
Keep your space moving forward
Small decisions can extend the useful life of a workplace.
- Keep product information, finish details, and assembly guidance together.
- Use manufacturer instructions for cleaning and adjustments.
- Flag loose hardware or damaged parts for appropriate service.
- Review workstation setups when people, equipment, or roles change.
- Consider reuse and reconfiguration before replacing a full furniture system.
Talk through your project